Engineering

As soon as the decision is made to implement the new logistics concept, Van Looy Group creates a basic design based on a statement of requirements. This basic design contains legit elements for the building permit request.

Immediately after, an integrated (BIM) detailed design of the logistics systems (storage systems, MHE), technical utilities (high/low voltage, fire safety, data networks, HVAC, sanitation) and building structure and architecture is made.

At the end of this step, Van Looy Group translates the integrated design into a rock-solid tender, partitioned in multiple contract packages.

Curious what we can do for you